Español French Русский язык

Our Products

News
  • How to choose good overcurrent parts for slurry pump manufacturers Read more...
  • Summary of the principle and assembly of the impeller seal of the slurry pump. Read more...
  • Research status of domestic and foreign research on wear-resistant materials of slurry pump over-flow parts. Read more...
  • Basic condition assumption of two-phase flow of slurry pump. Read more...
  • The slurry pump model is complete, the parameters and structure diagram are introduced separately.Read more...
  • Slurry pump selection manual calculation formula. Read more...
  • Slurry pump has such long service life. Read more...
  • The role of slurry pump bearings. Read more...

Analytical mud pump safety operation procedures and precautions

Mud pump safety operation procedures and precautions

First, the pump must be installed on a stable foundation or foundation, and should not be loose. Second, check before starting:

 1. Each connection part should be fastened;

2. The direction of electric rotation should be correct;

3. The clutch is flexible and reliable;

4. The pipeline connection is firm, the seal is reliable, and the bottom valve is flexible and effective.

3. Before starting, the suction pipe, the bottom valve and the pump body must be filled with water, and the upper end of the pressure gauge buffer is filled with oil.

4. Rotate by hand to make the piston reciprocate twice. If there is no obstruction and the line insulation is good, it can be started without load. After starting, the load will be gradually increased after the operation is normal.

5. During operation, pay attention to the sealing of each sealing device and adjust if necessary. Pull rods and auxiliary rods should always be lubricated with oil.

6. The sediment concentration in the mud should not exceed 10% during operation.

 7. The mud pump with several speeds is to make the splash lubrication reliable. It should run several speeds in each shift, the time is not less than 30 seconds.

8. It is strictly forbidden to shift gears during operation. When shifting is required, the pump should be stopped.

 9. Pumps should be stopped when there is abnormal noise or water weight during operation, abnormal pressure or obvious high temperature.

10. Under normal circumstances, the pump should be stopped at no load. When the pump stop time is long, all the drain holes must be opened, and the cylinder head should be loosened, the bottom valve drain rod should be lifted, and all the mud sand in the pump body and the pipeline should be drained.

 The company focuses on the domestic leading level, relies on technological innovation, accelerates the pace of product upgrading, comprehensively upgrades product grades, optimizes product structure, enhances core competitiveness, expands business areas, and always adheres to people-oriented, technological innovation, emphasizing internal strength and external molding. Image, constantly improve the internal management mechanism, improve product quality, with excellent and unique products, perfect after-sales service, good corporate reputation, and constantly meet the needs of our customers.

Believe that we believe in yourself, a perfect cooperation begins with communication, immediately pick up the phone in your hand, contact us, we will provide you with 24-hour professional service!

About us

NO.245, Tianshan Street, High Technology Industrial Development Zone, Shijiazhuang,Hebei Province
China, P. R. C.

Tel : + 86 311 8069 6322

Fax : + 86 311 8992 8383

E-mail : sales@mizztech.com Read More

Our social